…which inspire; and Two Trees Management Company, a Brooklyn-based, family owned real estate development firm that has owned, managed and developed a portfolio worth over $4 billion in real estate….
…Additionally, the façade will feature a single ETFE skin supported by a cable net system. The design requires approximately 135,000 square feet of triple-layered ETFE pillows and air inflation system…
…tribute is intended to be a new landmark in the town of Vail celebrating the family’s commitment to their adopted hometown, and the positive changes that they have instilled within…
Birdair, Inc. Receives 2010 IFAI International Award of Excellence Company Honored For Stunning Moses Mabhiba Stadium Work Published: November 09, 2010 Birdair, Inc., the leading specialty contractor of lightweight long-span…
…a beautiful new complex complemented by 17 inverted PTFE membrane cone-structure canopies by Birdair. San Diego Airport’s consolidated Rental Car Center, set to open in 2016, will house leading national…
…make the parking garage attractive and unique. With this special need in mind, they turned to Birdair, the expert on custom tensile structures, to design and construct the PTFE canopies….
…Arthur Ashe Stadium, scored a match point when they tapped Birdair to design and build a retractable roof for the high-profile stadium. The venue, which serves as the home for…
…polytetrafluoroethylene, is a Teflon®-coated woven fiberglass membrane that is extremely durable and weather resistant. PTFE fiberglass membranes can be installed in climates ranging from the frigid arctic to the scorching…
…home stadium for two NFL teams. Opened in 2010, the 2.1 million square foot stadium was designed by architects Ewing Cole and 360 Architecture, and has the largest seating capacity…
…Jersey. A world-renowned specialty roofing subcontractor, Birdair was awarded the design-build contract for two 9,000 square-foot custom tensile structures located on the North and South upper decks of the stadium….
…than 6,000 people, ample parking, upgraded concessions, and air-conditioned restrooms. An Orchestrated Effort Architecture firm CORE, Tatum-Smith Engineers, and Crossland Construction worked to complete this project. But, they needed something…