…site design objectives. We now have a label that says we are able to offer them a product that meets their needs,” notes Birdair’s Director of Architectural Development Bill Barden….
…a flying-mast and cables to allow for a column-free space below. The site also includes four connected PTFE tensile canopies over a splash pad for children and adults to enjoy…
…re-built stadium facilities being constructed for the World Cup event. There are many factors to consider in renovation versus new-build, including, facility requirements, time and budget constraints, site location, logistics,…
…film to transportation to site compared to other similar cladding material, resulting in a reduction of the overall carbon footprint. In addition, ETFE systems provide ample natural daylighting, minimizing energy…
…Department of Energy. Part of the ongoing redevelopment of the Domino Sugar Refinery site, Domino Square Park spreads along the waterfront just north of the Williamsburg Bridge in Brooklyn. An…
…who supervised on site during the canopy construction. “I sat in the stands after the membrane was installed and it does an outstanding job of lowering the temperature inside the…
…site, with the surrounding park containing a pond, walkways, seating and landscape along its edges, all open to the citizens of London. Curving walkways continue into the interior of the…
…hurricanes, including Hurricane Charley, with 140-mph winds. One year earlier, Birdair had installed roof and canopy structures on-site to cover the hospital’s main entrance, emergency entrance and two-story central lobby….
…UV protection, and is additionally waterproof, anti- fungal, long lasting and easy to clean. For a customized look, Umbrellas can incorporate branding and logos. Architectural Umbrellas arrive on site pre-assembled…
…meaning it packed top winds of 135 miles per hour. Both the Georgia’s governor and Atlanta’s mayor declared the city in a state of emergency. Birdair officials noted that, on…
…erected through the use of hydraulic cranes without any propping or temporary supports. The large size of the trusses made it mandatory to assemble trusses on the job site prior…
…can enter into a service agreement for one to ten years. The agreement covers on-site inspection visits. A full inspection is made of the fabric membrane and/or steel cable structure…