…glass fibre membrane roof that will span a total of 16,600 square metres providing cover for the East, West and Southern perimeter of the structure. Completion of the 25,000 seat…
…touring concerts in the Mid-South. The new site, located in Pinnacle Hills in Rogers, AR., has everything the WAC was looking for in a permanent location, including proximity to I-540,…
…School of Architecture and Planning on October 13, 2010. Overseen The Birdair-sponsored lecture will be held at 301 Crosby Hall on the UB’s South Campus at 5:30 p.m. The lecture…
…Durban, South Africa, the stadium was built for the 2010 Federation Internationale de Football Association (FIFA) World Cup. Moses Mabhiba Stadium, also known as Durban Stadium, earned the IFAI Outstanding…
…presence of Birdair and the Taiyo Kogyo group in South America and provide better sales support to prospects and customers in the region. Brazil will host the 2014 Fédération Internationale…
…points of the south and north ends of the parking facility. Birdair previously installed walkway and terminal PTFE canopies at the airport totaling approximately 38,000 square feet in 2004. “The…
…Jersey. A world-renowned specialty roofing subcontractor, Birdair was awarded the design-build contract for two 9,000 square-foot custom tensile structures located on the North and South upper decks of the stadium….
…new means of improving their facilities and to gain advice from leading experts from South America, Asia and Europe. Learn more at www.stadiadesignandtechnology.com. Birdair has completed work on more than…
…responsible for the promotion of photosynthesis thus facilitating plant growth. While ETFE films are very elastic (up to 600% at breaking point), they are still structurally resistant and do not…
…come.” The majority of the roof system features approximately 500,000 square feet of PTFE fiberglass membrane. Approximately 35,000 square feet of the roof’s south leading edge utilizes single-layered TensoSky ETFE…
…south plazas. New lighting and trees will round out the improvements, along with new signage. The project began in the summer of 2013 and is set to be complete in…
…and re-check the measurements against the plans and survey drawings. Plus, the timing was very tight.” The mall, located south of Mexico City near the scenic mountains of Cuernavaca in…