New Arkansas Music Pavilion To Open on a Good Note with Birdair Nothing can stop the music at the new Walmart Arkansas Music Pavilion (AMP). Published: July 08, 2014 Thanks…
…time for basketball season. The current roof, also installed by Birdair, is nicknamed “the bubble” by students and faculty because of the fact that it is an air-supported fabric membrane….
…has completed more than 1,200 tensile architecture installations worldwide. Download PDF Version: 2009-10-14_IFAI_Award_2009.pdf Battery Park City Ferry Terminal Location: New York, New York The Battery Park City ferry terminal features…
…to Birdair, the project team consisted of engineer Weidlinger and Associates, New York, New York and general contractor Astillero Rio Santiago, Ensenada, Argentina. To date, Birdair has completed work on…
…transparent ETFE film. Download PDF Version: MetalsinConstruction-Yonkers Fall-2013.pdf Empire City Casino at Yonkers Raceway Location: Yonkers, New York Empire City Casino at Yonkers Raceway in Yonkers, New York welcomes guests…
…fabricated and installed the tensioned membrane roof and facade cladding systems for this new world-class athletic facility. Central to Red Bull Arena’s sleek new contemporary, European-style design are its roof…
…roofing system atop the atrium of the university’s Architecture Building. The retrofitted roof features Birdair’s innovative TensoSky® ETFE film. The new roof covers the atrium’s open space and allows students,…
…attractive to visitors. These efforts included a new marketing campaign, a new air traffic control tower, the addition of a parking garage, ticketing enhancements, the addition of security billboards and…
Birdair Launches New Website & Expansive Project Portfolio Site educates, informs and showcases the company’s wide range of services and applications. Published: March 27, 2014 Birdair, the leading specialty contractor…
…first football game and since then has been a staple of the local economy, but a new stadium was needed as the program continues to attract new fans and great…
…re-built stadium facilities being constructed for the World Cup event. There are many factors to consider in renovation versus new-build, including, facility requirements, time and budget constraints, site location, logistics,…
…cable structure, including the PTFE outer roof and liner membrane. The project involved building a new lower tier and retaining the upper tier with the addition of a new 920,000-square-foot…