…they encountered at the Denver International Airport (DIA), one of the busiest airports in the United States. The engineers on DIA’s Hotel and Transit Center (HTC) program encountered a dilemma…
Birdair, Inc. Project Receives 2010 AIA 25-Year Award Hajj Terminal at King Abdul Aziz International Airport in Saudi Arabia Honored by AIA For Standing Test of Time Published: July 01,…
…of 26 years, the new state of the art Tensotherm roofing system will provide five times the existing insulation value and will address condensation issues stemming from the aquatic center’s…
…Piscina Olympica, but will also maintain its brilliance over time with a high level of resistance to staining, soiling and moisture,” says Hector Perez, business development manager for Birdair. In…
…re-built stadium facilities being constructed for the World Cup event. There are many factors to consider in renovation versus new-build, including, facility requirements, time and budget constraints, site location, logistics,…
…to their connection to maritime life. In addition to the use of thin film photovoltaic panels on the tensile structure, the museum also installed a rotating wind scoop and vertical-axis…
…over time due to its durability.” Retrofit roofing construction on McClain Athletic Facility began in May 2012 and was completed in August 2012. In addition to Birdair, the project team…
…to show movies and as a stage for performances. In the wintertime, the demountable PVC mesh fabric panels will be taken down and stored so the plaza space can be…
…Brasilia was Renovated with a new PTFE membrane roof in time for the 2014 World Cup About Birdair: Birdair, Inc. is the leading specialty contractor of custom tensile structures throughout…
…partners and our first class design, fabrication and installation expertise for this attractive PTFE canopy. It’s a great choice for McLane Stadium that will stand the test of time.” A…
…throughout the world, completed the engineering, fabrication, shipping and installation — on time and on budget — in less than 11 months. In addition, Birdair materials delivered included highly translucent…
…PTFE fabric, structural steel, cable, hardware and installation services – on time and on budget. “No other airport in the world is quite like it,” said Peter Wright, project manager…