…only ENERGY STAR® qualified and Cool Roof Rating Council (CRRC) certified architectural fabric membrane, helping to reduce surface roof temperatures and decrease heat absorption. More specifically, as an ENERGY STAR…
…improve the facility’s sound quality. Birdair was the only bidder on the project due to its aggressive five-month timeline. Work began this month and is slated to finish in August…
…oversaw the installation of the cable structure and fabric roof for the South American stadium. Birdair served as roofing subcontractor for the 53,000-seat capacity stadium, which features 312,545 square feet…
…Argentina), Cape Town Stadium (Cape Town, South Africa), Moses Mabhida Stadium (Durban, South Africa) and Nelson Mandela Bay Stadium (Port Elizabeth, South Africa). In addition, Birdair was recently awarded the…
…providing modern aesthetic Birdair, Inc., the world’s leading specialty contractor for custom tensile membrane structures for over 60 years, helped restore the legacy of the original Jones Beach Boardwalk Café…
The Minneapolis Metrodome Sports a New Roof From Birdair, Inc. Roof Replacement Completed in Five Months in Time for NFL Preseason Football Published: August 02, 2011 Birdair, Inc., the leading…
Birdair, Inc. to Attend 2011 Greenbuild International Conference and Expo Visit Birdair at Cabot Corporation’s Booth #325N to Learn More About TensothermTM with LumiraTM Aerogel Published: September 27, 2011 Birdair,…
…home stadium for two NFL teams. Opened in 2010, the 2.1 million square foot stadium was designed by architects Ewing Cole and 360 Architecture, and has the largest seating capacity…
…to July 13, 2014, in 12 Brazil host cities. For more information, visit: http://www.fifa.com/worldcup/index.html. Other members of the project team include owner: Fonte Nova Negocios E Participacoes S.A. – FNP,…
…third busiest airport in the world in terms of aircraft movement. The parking infrastructure upgrade is part of a seven-year, $1.9 billion terminal improvement project to renew and modernize the…
…project team for a solution to modify the existing steel structure to accept the additional loads, which the upper deck tensile canopies put on the building,” says Jeff Sellers, Director…
…of the Sinai Peninsula, serves more than five million tourists and travelers annually. In Egypt, only Cairo International Airport is busier. That’s a lot of people walking through two main…